Event Scheduler
Macroclimate Leaf Gas Exchange Canopy Processes Growth and Allocation Event Scheduler Soil Processes Respiration Ageing Discussion Appendix I and II

Up

WIMOVAC Model Event Scheduler

Co-ordinating the phasic growth model with the numerical integration procedures required by the physical models of leaf, canopy and soil is complex and prone to error. Consequently a dedicated central scheduling algorithm has been incorporated into the model which tracks each process and initiates calculations at the appropriate time. The central scheduler is coded as a global scope module that may then be called from any model dialog requiring simulated growth information and follows the procedure shown below.

Procedural flow of the central event scheduler. Processes requiring short interval numerical integration indicated in yellow. Long term integration of daily totals and associated once daily processes indicated in blue.

 

Home ] Up ]

Send mail to humph@essex.ac.uk with questions or comments about this web site.
Copyright © 1998 WIMOVAC Ltd.
Last modified: August 19, 1997