WIMOVAC Model Event Scheduler
Co-ordinating the phasic growth model with the numerical integration
procedures required by the physical models of leaf, canopy and soil is complex and prone
to error. Consequently a dedicated central scheduling algorithm has been incorporated into
the model which tracks each process and initiates calculations at the appropriate time.
The central scheduler is coded as a global scope module that may then be called from any
model dialog requiring simulated growth information and follows the procedure shown below.

Procedural flow of the central event scheduler. Processes requiring short
interval numerical integration indicated in yellow. Long term integration of daily totals
and associated once daily processes indicated in blue.